KEI Industries, Silvasa
Steelbuild Infra Projects Pvt. Ltd. is proud to highlight its collaboration with KEI Industries, a leading name in the cable manufacturing industry. The PEB (pre-engineered building) constructed for KEI Industries in Silvassa, Dadra and Nagar Haveli, is a landmark project that showcases our ability to deliver exceptional industrial infrastructure tailored to meet specific client needs. This facility combines functionality, efficiency, and modern design, making it a testament to our commitment to quality and innovation in the PEB sector.
Project Overview
KEI Industries required a high-capacity industrial facility to support its growing production operations while adhering to stringent quality and safety standards. The project’s primary objectives included creating a spacious, durable, and efficient manufacturing space with room for future scalability. Additionally, energy efficiency and environmental sustainability were key considerations in the design and construction process.
The facility was envisioned to accommodate heavy-duty machinery and streamline workflow operations. Steelbuild Infra was tasked with delivering a structure that could handle these requirements without compromising on aesthetic appeal or structural integrity.
Challenges and Solutions
The project presented several challenges, including the need for a robust structure capable of supporting the weight and vibrations of heavy manufacturing equipment. The location in Silvassa, with its humid climate, necessitated advanced insulation and corrosion-resistant materials to ensure the longevity of the facility.
To address these challenges, Steelbuild Infra employed high-grade steel and prefabricated components, manufactured in our advanced production units. The prefabrication process allowed for precise quality control and faster project execution. Thermal insulation and ventilation systems were integrated into the design to maintain an optimal indoor environment while reducing energy consumption.
Additionally, the team designed a modular layout that could be easily expanded to accommodate KEI Industries’ future growth. The use of advanced engineering techniques ensured that the building met all safety and durability standards.
Design and Construction Highlights
The PEB structure for KEI Industries features wide spans and a column-free design, maximizing usable space for machinery and production processes. The layout was carefully planned to facilitate efficient workflow and enhance productivity.
Durability and safety were prioritized throughout the project. The use of corrosion-resistant materials and protective coatings ensures that the building can withstand the region’s humid climate. Fire-resistant materials and clearly defined evacuation routes were incorporated into the design to meet industrial safety standards.
The facility also emphasizes energy efficiency, with features such as natural lighting systems, energy-efficient fixtures, and optimized ventilation. These elements reduce operational costs and align with KEI Industries’ commitment to sustainability.
Client Impact and Feedback
The completed facility has had a transformative impact on KEI Industries’ operations, enabling them to increase production capacity and improve operational efficiency. The client expressed appreciation for Steelbuild Infra’s professionalism, timely delivery, and attention to detail, highlighting the project as a key factor in their continued growth and success.
Lasting Impact
The PEB structure for KEI Industries in Silvassa stands as a symbol of Steelbuild Infra’s dedication to delivering exceptional industrial solutions. By combining innovative design, sustainable practices, and engineering excellence, we have created a facility that not only meets the client’s current needs but also positions them for future success. This project reaffirms our role as leaders in the PEB industry, committed to building a better future for our clients.
Project Information
Project Name: KEI Industries
Area: 5640 Sq. Mtr.
Tonnage: 316 MT
Project Date: December, 2022
Avenue End Date: March, 2023
Location: Silvassa, Dadra and Nagar Haveli, India