Jhajjar Bahadurgarh Project
Steelbuild Infra Projects Pvt. Ltd. is renowned for delivering high-quality Pre-Engineered Buildings (PEB) across various sectors. One of our key projects, the Jhajjar, Bahadurgarh Project, located in Jhajjar, Bahadurgarh, Haryana, India, stands as a testament to our expertise in providing efficient, durable, and cost-effective solutions for industrial construction. The PEB building constructed for this project was designed to meet specific operational requirements while ensuring strength, flexibility, and sustainability.
Project Overview
The Jhajjar, Bahadurgarh Project involved the construction of a Pre-Engineered Building for an industrial client who required a versatile structure to support their growing operations. The client chose Steelbuild Infra for its expertise in delivering tailored PEB solutions that meet the highest standards of quality and performance. The project scope included the design, manufacturing, and installation of the PEB structure, with a strong focus on fast delivery and cost efficiency.
Design and Engineering
The design of the Jhajjar, Bahadurgarh Project was driven by the need for a spacious and adaptable industrial facility. The building needed to accommodate heavy machinery, large-scale operations, and storage while providing optimal flexibility for future expansion. The PEB design allowed for large, clear spans, which eliminated the need for internal columns and maximized the usable space.
Our engineering team used advanced software tools and simulations to ensure the structural integrity of the building. The PEB design incorporated materials that were both durable and sustainable, while also considering local environmental factors, such as the climate and seismic activity in the area. The end result was a building that was not only cost-effective but also built to withstand the test of time.
Key Features
- Clear Span Design: The building’s design featured a clear span structure, ensuring there were no internal supports, which allowed for efficient use of space and easy movement within the building.
- Energy Efficiency: We incorporated insulated roof and wall panels that ensured optimal temperature control. This reduced the need for artificial cooling or heating, leading to long-term energy savings.
- Fast Construction Time: The PEB system allowed for rapid construction, as many of the building components were pre-fabricated and assembled on-site. This significantly shortened the construction timeline, enabling the client to start operations sooner.
- Strength and Durability: The building was constructed with high-strength steel components, which not only provided superior strength but also enhanced the building’s ability to resist external environmental factors, such as heavy winds or rain.
Construction Process
The Jhajjar, Bahadurgarh Project followed Steelbuild Infra’s streamlined construction process, ensuring efficiency at every stage. After thorough discussions with the client, the design phase began. Our team worked closely with the client to finalize the building’s specifications, ensuring that all functional and aesthetic requirements were met.
Once the design was finalized, the manufacturing of prefabricated components began at our facility. These included the steel frame, cladding, roofing panels, and other components. These parts were manufactured to exact specifications, ensuring high-quality control. After production, the components were transported to the site, where the installation phase began.
The construction team worked efficiently to assemble the building, ensuring that the timeline was adhered to and that the structure was built according to the highest standards. Throughout the construction process, Steelbuild Infra’s project managers oversaw the work to ensure safety, quality, and compliance with local regulations.
Client Benefits
The Jhajjar, Bahadurgarh Project provided numerous benefits to the client. The PEB structure was built quickly, minimizing downtime and enabling the client to begin operations ahead of schedule. The building’s durability ensured that the client would not have to worry about frequent maintenance or repairs, providing a long-term solution for their operational needs.
Additionally, the PEB design offered the client flexibility for future expansion. As their business grows, the building can be easily adapted to accommodate additional space or operational requirements. The cost-effective construction process also allowed the client to achieve their infrastructure goals within their budget.
Final Thoughts
The Jhajjar, Bahadurgarh Project highlights Steelbuild Infra’s ability to deliver Pre-Engineered Buildings that meet the specific needs of industrial clients. By combining advanced engineering, quality materials, and efficient construction practices, we were able to provide the client with a durable and cost-effective solution that supports their long-term business growth. The project stands as a shining example of how PEB buildings can be tailored to provide flexibility, strength, and sustainability for modern industries. At Steelbuild Infra, we continue to set the standard for excellence in the construction of Pre-Engineered Buildings across India.
Project Information
Project name: Jhajjar, Bahadurgarh Project
Area: Sq. Mt.
Tonnage: MT
Project Date: 25 June, 2024
Avenue End Date: 08 July, 2024
Location: Jhajjar, Bahadurgarh, Haryana, India