Malha-Majra Project
Steelbuild Infra Projects Pvt. Ltd. has a long history of providing innovative and high-quality Pre-Engineered Buildings (PEBs) across various sectors, and one of the remarkable projects we’ve successfully completed is the Malha-Majra PEB building located in Sonipat, India. This project stands as a testament to our ability to deliver versatile, efficient, and sustainable building solutions tailored to the unique needs of our clients.
Project Overview
The Malha-Majra PEB project in Sonipat was an important initiative that required an advanced building solution to meet the client’s specific industrial requirements. The client sought a durable, cost-effective, and functional facility for their operations. The building needed to support large-scale activities such as manufacturing, storage, and distribution, while also withstanding local climate conditions, which can be extreme during certain seasons in Sonipat.
Steelbuild Infra was selected for this project due to our expertise in the PEB industry and our track record of delivering quality structures on time and within budget. The client required a building that was not only structurally sound but also optimized for energy efficiency and ease of maintenance. Steelbuild Infra’s PEB system provided the perfect solution, offering flexibility, strength, and scalability.
Design and Engineering
The design of the Malha-Majra building was carried out with a focus on maximizing the available space and ensuring the structure was adaptable to the client’s operational needs. Our team of engineers and architects collaborated with the client to understand their exact requirements, taking into consideration the building’s purpose, future scalability, and environmental factors.
The PEB design included several advanced features, such as a clear-span structure, which allows for large, open spaces without the need for internal columns. This design is ideal for industrial buildings, as it facilitates smooth movement of goods and equipment throughout the facility. The PEB system also allowed for quick assembly, reducing the construction timeline and minimizing the disruption to the client’s operations.
One of the significant advantages of PEBs is their energy efficiency. For this project, Steelbuild Infra incorporated insulated roofing and cladding systems, ensuring that the internal temperature of the building could be maintained efficiently, thus reducing energy costs. The use of high-quality steel also contributed to the building’s longevity, ensuring it would withstand the test of time, even in harsh weather conditions.
Key Features
- Clear Span Design: The clear-span design provided large open spaces, essential for the smooth functioning of the client’s operations.
- Energy-Efficient Roofing and Cladding: The insulated roof and walls helped reduce energy consumption, leading to significant cost savings for the client.
- Durability and Strength: The PEB building was designed to handle extreme weather conditions, ensuring long-term performance with minimal maintenance.
- Quick Construction: Steelbuild Infra’s prefabricated materials and efficient construction techniques ensured the project was completed on time.
- Adaptability: The building’s design allows for future expansions or modifications to meet the growing needs of the client.
Construction Process
The construction of the Malha-Majra PEB building followed Steelbuild Infra’s tried-and-tested process, which ensures efficiency, quality, and safety throughout every phase of the project. Prefabricated steel components were fabricated in our manufacturing facility and then transported to the construction site. Our skilled team ensured that the materials were assembled correctly and that the structure was erected quickly and safely.
By utilizing a pre-engineered building system, we were able to reduce construction time significantly. The modular design of the PEB components ensured a seamless installation process, and the project was completed on schedule without compromising quality.
Client Benefits
The Malha-Majra PEB building has delivered significant benefits to the client. The spacious interior layout allows for efficient storage and movement of goods and equipment, while the building’s robust construction ensures a safe and secure environment for operations. The energy-efficient features have reduced utility costs, and the adaptable design provides flexibility for future growth or changes in operational needs.
Additionally, the low maintenance requirements of the PEB system will reduce long-term operational costs, making it an ideal investment for the client.
Final Thoughts
The Malha-Majra PEB project in Sonipat, India demonstrates Steelbuild Infra’s ability to provide cost-effective, sustainable, and versatile building solutions. By delivering a high-quality, energy-efficient, and durable PEB building, we have once again proven our commitment to helping clients achieve their operational goals while providing them with long-term value. This project reinforces our reputation as a leader in the PEB industry, capable of providing custom solutions that meet the unique needs of every client.
Project Information
Project name: Mr. Kamal Ji
Area: 7000 Sq. Mt.
Tonnage: 291 MT
Project Date: March, 2023
Avenue End Date: August, 2023
Location: Malha-Majra, Sonipat, India