Attar Singh Project
Steelbuild Infra Projects Pvt. Ltd. has successfully completed the Attar Singh Project in Shahpur, Haryana, exemplifying our proficiency in delivering high-quality pre-engineered buildings (PEB) tailored to meet the client’s needs. This project is a perfect example of how we combine efficiency, innovation, and sustainability to provide a world-class building solution for industrial use.
Project Overview
The Attar Singh Project involved constructing a facility in Shahpur, Haryana, where the client needed a robust industrial space for their operations. With Steelbuild Infra’s expertise in PEB, we delivered a structure that maximized usable space, ensured safety, and incorporated sustainable practices. The project was executed with the goal of offering a long-lasting, efficient, and environmentally friendly solution.
Design and Engineering
The design process for the Attar Singh facility was highly collaborative. Our engineering team worked closely with the client to fully understand their requirements, from structural integrity to energy efficiency. We ensured that the building was adaptable, scalable, and future-proof, allowing the client to grow without significant modifications to the infrastructure.
We integrated energy-efficient designs and modern PEB technology to reduce the building’s carbon footprint. The end result was a facility that not only met immediate needs but also provided room for future expansion with minimal disruption.
Materials and Construction
For the Attar Singh project, we used high-quality pre-engineered steel materials. Steel is a versatile material, offering strength, durability, and flexibility—ideal for industrial buildings. It is also more cost-effective and faster to assemble than traditional construction materials, which allowed us to deliver the project ahead of schedule.
The construction process began with site preparation, followed by the fabrication of steel components at our facility. These were then delivered to the site in phases. The assembly was carried out using cranes, ensuring the steel framework was installed quickly and accurately. The PEB technology we used ensured minimal material wastage, making the process both efficient and environmentally friendly.
Key Features of the Attar Singh Project
Sustainability: Steelbuild Infra emphasizes eco-friendly practices. In this project, we used sustainable materials and efficient systems that help reduce energy consumption and environmental impact.
Durability: The pre-engineered steel structure is designed to endure harsh weather conditions and corrosion, ensuring a long lifespan with minimal maintenance costs.
Flexibility and Scalability: The building’s design allows for future expansions. The PEB approach makes it easy to add more space as the business grows, ensuring that the facility can evolve as needed.
Cost-Effectiveness: PEB construction is typically more affordable than traditional building methods. The Attar Singh Project was completed within budget, thanks to the cost savings in materials and labor.
Safety: Safety was a top priority throughout the construction process. We adhered to all safety regulations and ensured that the building itself is designed with fire-resistant materials and efficient emergency evacuation routes.
Aesthetics: While functionality was key, the aesthetic appeal of the building was also considered. The clean lines and modern design enhance the visual appeal of the facility, making it not only practical but also pleasing to the eye.
Challenges and Solutions
Like any large-scale construction project, the Attar Singh Project faced its challenges. Adverse weather conditions at the site delayed some stages of the work. However, by using weather-resistant materials and adjusting our construction schedule, we managed to minimize the impact of these delays.
Another challenge was coordinating the delivery of materials. Steelbuild Infra’s project management team effectively communicated with suppliers, ensuring timely deliveries and smooth logistics, which kept the project on track.
Conclusion
The Attar Singh Project in Shahpur, Haryana, highlights Steelbuild Infra Projects’ commitment to delivering top-notch pre-engineered buildings. The project was completed on time, within budget, and with minimal environmental impact, showcasing our ability to meet client needs with innovative, sustainable solutions. This project serves as a prime example of how PEB technology can transform industrial facilities into efficient, scalable, and future-ready spaces. Steelbuild Infra Projects continues to push the boundaries of construction, offering solutions that are not only functional but also sustainable and cost-effective.
Project Information
Project name: Attar Singh
Area: 12,636 Sq. Mt.
Tonnage: 427 MT
Project Date: December, 2022
Avenue End Date: June, 2023
Location: Shahpur, Haryana, India